Features
Usage
Effects
# Features
· Resistant to oil, dirt, seepage, acids and alkalis
# Usage
- Clean thefloor with an abrasive brush, generally using a sequence of #36 – #60 – #80 – #120 to polish and clean. Overall, touch with your hand to feel the surface of the stone is no longer rough, become smooth can be applied.
- If you can, clean it with plenty of water, even better with a high-pressure water gun.
- Apply the first coat when the stone is thoroughly dry.Touch with your hand to feel the non-stick hand can be painted the second time (generally 25 ℃ above, 6 hours later). The longer the interval between the two times, the better.
- Above 25 °C, it dries in 12 hours and can be tested with acid. 48 hours later it can be tested for severe destructive properties.
Precaution
1. The construction temperature should be above 15℃ and the storage temperature should be above 0℃.
2. Avoid contact with eyes. If it accidentally enters eyes, please rinse with water immediately.
3. Do not take orally, please store in a cool, dry place out of reach of children.




